Task force leadership after a major fire
Production destroyed, customer deliveries fully restored within four months.
View the caseTask Force and Crisis Management
We take responsibility on site, set up the task force and work with your team on securing deliveries. Ready within 48 hours.
In an acute crisis it is not the best analysis that decides the outcome, it is the fastest effective response. We come onto the shopfloor, take responsibility, run the containment actions and work with your team until the process is stable again. Then we hand over. We do not stay on as a permanent operator, we stabilize and hand back.
Our first move is to secure deliveries to your customer, often through special logistics or short-term replacement production. In parallel we work on the root cause with successfully proven problem-solving capability, aligned to VDA 6.3. We handle communication with the OEM, lead the team on the shopfloor and document every step in an audit-proof way.
from completed engagements
100 %
customer deliveries restored within four months after a major fire had shut down series production.
1 week
air bridge established, covering the majority of customer demand.
3 OEMs, 12 product variants
supplied without interruption throughout the same engagement, with no line stoppage at the customer.
An interim manager is a single executive who holds a position for a defined period. A task force is an established team that comes to the line for an acute case, works hands-on and resolves the situation using defined methods. We offer both, for different situations. Interim leadership carries a role, a task force resolves a case and hands back.
When your team is at capacity, the escalation at the customer is already running and internal measures are not taking effect fast enough. An external task force adds operational capacity and methodical distance without thinning out your day-to-day business any further.
De-escalation brings the acute situation under control, secures deliveries and calms the customer. Restructuring permanently changes the structures of a company. We focus on de-escalation and the stabilization that follows, then hand the stable process over to your team.
Secure deliveries first, if necessary through special transport or a replacement source, so the customer's line keeps running. Root cause analysis starts in parallel with an 8D. What matters most is clean communication with the OEM, so a technical problem does not turn into a loss of trust.
Cost depends on scope, duration and the number of specialists on site, and is calculated transparently up front. The deciding factor is rarely the daily rate, it is what a line stoppage or a lost customer would cost.
In acute cases we are on the shopfloor within 48 hours. In the automotive industry a response time of 24 to 48 hours is the usual benchmark for a first deployment, because JIT and JIS chains carry no buffer.
The 8D process moves through eight disciplines, from the containment action to the verified corrective action. The problem is described and contained first, deliveries are secured through a containment action, then the root cause is identified and permanently eliminated. Response deadlines are set individually by each OEM.
Controlled shipping is an OEM escalation level. Under CSL1 the supplier inspects the affected parts to 100 % in a separate process. Under CSL2 an additional inspection by an independent third party is added, at the supplier's expense. The goal of any task force is to lead the customer out of that level in an orderly way.
Production destroyed, customer deliveries fully restored within four months.
View the caseCritical supplier issues resolved and short-term supply secured.
View the caseA crisis does not get quieter while you wait. The earlier a task force is on the shopfloor, the smaller the damage at your customer stays. If an escalation is running or building at your site, talk to us before the line stops.
Request support