21,500 square meters relocated, 10 % under budget

Production operation with manufacturing spread across several floors, limited space and outsourced warehousing.

Starting situation

Production was spread across several floors, which led to a shortage of space and long transport routes. Around 5,000 pallets were stored externally and had to be transported daily.

Measures

We redesigned the layout including material flow across 21,500 square meters and installed a narrow-aisle high-bay system, including supplier selection. With the new material flow system, external warehousing became unnecessary.

Results

21,500 square meters

layout and material flow redesigned.

10 % under budget

project completed, all logistics and production processes relocated within the planned period.

External warehousing of around 5,000 pallets eliminated.

Our mandates

Project leadership for the plant relocation, project management specialist.

More on Site Transformation