85 % OEE and full delivery performance within four months

Panoramic roof supplier whose series delivery capability to a major automotive customer was at risk.

Starting situation

Supply of panoramic roofs to a major automotive customer was at risk. Only small volumes could be shipped through special transport, while OEE sat well below the target value of 85 %. A significant shortage of qualified staff made the situation worse.

Measures

We built an additional manual production line to create capacity and introduced a four-shift system. In parallel, a training center was set up through which the required staff were recruited and qualified.

Results

85 % OEE

target value reached within four months.

100 %

on-time delivery of all customer orders within four months.

Manual production line successfully accepted, four-shift system and training center introduced.

Our mandates

Ramp-up team leadership, Vice President Operations, quality and analysis specialists.