Ramp-up and Operations · Tier-1 Supplier
85 % OEE and full delivery performance within four months
Panoramic roof supplier whose series delivery capability to a major automotive customer was at risk.
Starting situation
Supply of panoramic roofs to a major automotive customer was at risk. Only small volumes could be shipped through special transport, while OEE sat well below the target value of 85 %. A significant shortage of qualified staff made the situation worse.
Measures
We built an additional manual production line to create capacity and introduced a four-shift system. In parallel, a training center was set up through which the required staff were recruited and qualified.
Results
85 % OEE
target value reached within four months.
100 %
on-time delivery of all customer orders within four months.
Manual production line successfully accepted, four-shift system and training center introduced.
Our mandates
Ramp-up team leadership, Vice President Operations, quality and analysis specialists.